CURTAIN
SIDER

TIPPER
TRAILERS

SKELETAL
TRAILERS

     
WEEKLY
OR 1600km
MONTHLY
OR 6400km
3 MONTHLY
OR 20000km
6 MONTHLY
OR 40250km
ANNUALLY
OR 80500km
Park & Shunt
Valve Operation
Raise / Lower
Valve Operation
Modular ABS
Info-Center
To RAISE the trailer
1. Push the handle inwards fully before attempting to move the handle.
2. Once handle has been pushed in turn to the RIGHT to RAISE trailer.
3. When the desired height is reached release the handle, it will return the neutral position and the trailer will remain locked at the height.

To LOWER the trailer

1. Push the handle inwards fully before attempting to move the handle.
2. Once handle has been pushed in turn to the LEFT to LOWER trailer.
3. When the desired height is reached release the handle, it will return the neutral position and the trailer will remain locked at the height.

IMPORTANT

Before moving the trailer make sure that the handle is pulled out, (this should be done before commencing every journey) to ensure that the trailer operates at the correct ride height and that the brakes are apportioned correctly.